MIS 600 Course Project

$44.00

MIS 600 Course Project
Your Professor will assign teams at the beginning of the week. Once teams are assigned…

SKU: MIS 600 Course Project Categories: , Tags: , , ,

Description

MIS 600 Course Project 

MIS 600 Course Project

PROPOSAL Week 1

https://www.hiqualitytutorials.com/product/mis-600-project-proposal/

Check into the introduction thread, if you did not do so in Week 0.

Your Professor will assign teams at the beginning of the week. Once teams are assigned, here are some things you should be doing this week.

  1. Elect a team leader (recommended but not required). You can have the same leader throughout the course or change leaders each week. The leader will schedule meetings, facilitate discussion in the meetings, and put team deliverables in the Dropbox.
  2. Purchase a headset (if you don’t have one)—You will need a headset with microphone to meet with your team in iConnect.
  3. (10 points)Hold an iConnect meeting with your team and record it (this is part of your participation grade). The iConnect areas will be active after your professor assigns teams.
  4. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  5. (25 points)Select a business problem that can be solved with technology (the solution must have a software component, a database component, and hardware infrastructure). Your team will be consultants documenting business requirements and building a project plan to solve the business problem. Fill out the System Request Form in Doc Sharing. One team member should submit the completed form to the Dropbox for the team.
  6. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for the course deliverables this week and to indicate when you plan to have your team meeting in Week 2.

FYI—Next week you will be presenting your proposed project solution to management in your first of two iConnect presentation meetings with management.

Preview:

Top Dog is a hotdog cart business that sells hotdogs, chips, and sodas at local sporting events, catered outdoor parties, and within industrial parks around the city.  With ten carts that require maintenance, licensing, and periodic health inspections and with 12 employees in his company, Top Dog owner John Smith is having a difficulty keeping all of the company information updated and accessible.  This prevents him from accessing….

MIS 600 Course Project

Milestone One Week 2

https://www.hiqualitytutorials.com/product/mis-600-milestone-one/

Welcome to Week 2! Here are the activities this week.

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 3.
  4. (75 points)Milestone One—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain the following items.
    1. Cover Page
    2. Table of Contents
    3. Executive Summary
    4. Project Charter (Scope Definition)
    5. Project Value Statement
  5. (50 points)PowerPoint Presentation to Management—The presentation to management should be prepared using Microsoft PowerPoint. In the presentation, you should discuss the project you are undertaking, the scope, and key points on the value of the project to the business. The presentation should be created as though you were convincing senior management of the value of this project. This presentation will both be posted this week in the Dropbox and recorded in iConnect.

Preview:

Top Dog Hotdog is an MIS project that focuses on developing a cloud-based information system that is aimed at aiding the Top Dog Hotdog business to effectively manage different business operations. The system will contain a number of modules…

MIS 600 Course Project

Milestone Two Week 3

https://www.hiqualitytutorials.com/product/mis-600-milestone-two/

Welcome to Week 3! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 4.
  4. (50 points)Milestone Two—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One items and the following Milestone Two items:
    1. Project Strategy Statement
    2. Project Methodology
    3. Business Requirements and Rules
      1) Context-level data flow diagram (Visio)
      2) Use case list (normal business activities/work flows)
      3) Use case scenarios (description or narrative steps in each use case)
  5. (10 points) Peer Reviews—There is a Peer Review Template in Doc Sharing. Complete an individual review of each member of your team (including yourself) with comments (combine the evaluations in one Word file and place them in your individual Dropbox). These forms are confidential and should only be shared with your professor. Use them to let your professor know how to improve the course and/or the capstone experience.
  6. (25 points) Initial baseline Microsoft Project Plan in Microsoft Project. If you do not already have Microsoft Project software, it is available for free in the Student Software Store. In this initial effort, create a Gantt chart that shows all of your project activities from project initiation to project closing, in chronological order.  Include duration, start date, finish date, and predecessors for each item.

Preview:

The second stage will involve the definition of the requirement or documentation of the project specification. This will be drawn based on the survey results. Each identified problem will be evaluated and a possible solution will be defined where particular aspects that need to be fulfilled to enhance the…

MIS 600 Course Project

Milestone Three Week 4

https://www.hiqualitytutorials.com/product/mis-600-milestone-three/

Welcome to Week 4! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 5.
  4. (50 points)Milestone Three—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One and Two items and the following Milestone Three items:
    1. Logical Entity Relationship Diagram (Visio)
    2. Physical Entity Relationship Diagram (Visio)
    3. UML Use Case Diagram (Visio)
    4. UML Sequence Diagram for four Use Cases (Visio)
    5. UML Class Diagram (Visio)

Preview:

The payroll management solution will provide the business with a computerized/software based payroll management system that will allow a high degree of accuracy in keeping track of an employee’s personal information as well as benefits and time off.

The inventory management solution will provide a database with internet access for storing inventory and give the business the ability to calculate weekly orders based on historic sales data, allowing the business conserve capital…

MIS 600 Course Project

Milestone Four Week 5

https://www.hiqualitytutorials.com/product/mis-600-milestone-four/

Welcome to Week 5! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 6.
  4. (50 points)Milestone Four—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One, Two, and Three items and the following Milestone Four items:
    1. System Alternatives Descriptions
    2. Feasibility Analysis
    3. Technical Requirements and Assumptions
    4. Analysis of Needs vs. Capabilities for Contractors
  5. (10 points) Peer Reviews—There is a Peer Review Template in Doc Sharing. Complete an individual review of each member of your team (including yourself) with comments. Combine the evaluations in one Word file and place them in your individual Dropbox. These forms are confidential and should only be shared with your professor. Use them to let your professor know how to improve the course and/or the Capstone experience.

Preview:

To improve Top Dog’s manual process by using technology to optimize and access information in a timely manner for effective business decision-making and increase sales by 10%.  To provide hungry sport fans in….

MIS 600 Course Project

Milestone Five Week 6

https://www.hiqualitytutorials.com/product/mis-600-milestone-five/

Welcome to Week 6! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 7.
  4. (50 points)Milestone Five—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One, Two, Three, Four and the following Milestone Five items:
    1. Project Risk Analysis and Risk Management Plan
    2. Project Costs, Staffing, Resources, Dependencies, and Schedule

Preview:

Managing information, tracking inventory, and making smart business decisions based on readily available information are elements which enable a company to continue to profit in any marketplace. A cloud-based ERP is a system that will manage…

MIS 600 Course Project

Milestone Six Week 7

https://www.hiqualitytutorials.com/product/mis-600-milestone-six/

Welcome to Week 7! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 8.
  4. (50 points)Milestone Six—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One, Two, Three, Four, Five, and the following Milestone Six items:
    1. Integration of Internal and External Systems
    2. System Administration, Security, Backup and Recovery
    3. Scope Administration and Change Control Procedure
  5. (200 Points)Final Project Plan—After you complete Milestone Six, go through the entire Milestone Project Plan as a team to ensure that you have made any changes suggested by your professor during previous weeks and that all of the Milestones fit together in one cohesive, professional document. Your sponsor should be able to pick up the document, read it from cover to cover, and understand the project well enough to make a funding decision.
  6. (50 Points)The Final .mpp file, prepared in Microsoft Project, is also a deliverable for Week 7. Update your initial plan with any new steps you have discovered since it was created and add the resources you have described in Weeks 4 – 6.

Preview:

The project will be based on normal information system development techniques. In this case, a systematic system development technique that resembles the waterfall system development technique will be employed. This will involve an initial investigation to enhance the…

MIS 600 Course Project

Final Presentation Week 8

https://www.hiqualitytutorials.com/product/mis-600-final-presentation/

  1. (50 points)Final PowerPoint Presentation to management—The presentation to management should be prepared using Microsoft PowerPoint. In the presentation, you should discuss the project you are undertaking, the scope, and key points on the value of the project to the business. The presentation should be created as though you were convincing senior management of the value of this project. This presentation will both be posted this week in the Dropbox and recorded in iConnect.
  2. (10 points) Peer Reviews—There is a Peer Review Template in Doc Sharing. Complete an individual review of each member of your team (including yourself) with comments. Combine the evaluations in one Word file and place them in your individual Dropbox. These forms are confidential and should only be shared with your professor. This is your final chance to make Capstone better for future students. Don’t hesitate to tell us what you think.

Power Point Presentation

MIS 600 Course Project

Keller