MIS 600 Information Systems

$76.00

MIS 600 Information Systems 
Your Professor will assign teams at the beginning of the week. Once teams are assigned…

 

Description

MIS 600 Information Systems

MIS 600 Information Systems

A+ Capstone Course: Course Project Week 1-8| Discussions Week 1-7

MIS 600 Course Project Week 1-8

https://www.hiqualitytutorials.com/product/mis-600-course-project/

PROPOSAL Week 1

https://www.hiqualitytutorials.com/product/mis-600-project-proposal/

Check into the introduction thread, if you did not do so in Week 0.

Your Professor will assign teams at the beginning of the week. Once teams are assigned, here are some things you should be doing this week.

  1. Elect a team leader (recommended but not required). You can have the same leader throughout the course or change leaders each week. The leader will schedule meetings, facilitate discussion in the meetings, and put team deliverables in the Dropbox.
  2. Purchase a headset (if you don’t have one)—You will need a headset with microphone to meet with your team in iConnect.
  3. (10 points)Hold an iConnect meeting with your team and record it (this is part of your participation grade). The iConnect areas will be active after your professor assigns teams.
  4. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  5. (25 points)Select a business problem that can be solved with technology (the solution must have a software component, a database component, and hardware infrastructure). Your team will be consultants documenting business requirements and building a project plan to solve the business problem. Fill out the System Request Form in Doc Sharing. One team member should submit the completed form to the Dropbox for the team.
  6. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for the course deliverables this week and to indicate when you plan to have your team meeting in Week 2.

FYI—Next week you will be presenting your proposed project solution to management in your first of two iConnect presentation meetings with management.

Preview:

Top Dog is a hotdog cart business that sells hotdogs, chips, and sodas at local sporting events, catered outdoor parties, and within industrial parks around the city.  With ten carts that require maintenance, licensing, and periodic health inspections and with 12 employees in his company, Top Dog owner John Smith is having a difficulty keeping all of the company information updated and accessible.  This prevents him from accessing….

MIS 600 Information Systems

Milestone One Week 2

https://www.hiqualitytutorials.com/product/mis-600-milestone-one/

Welcome to Week 2! Here are the activities this week.

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 3.
  4. (75 points)Milestone One—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain the following items.
    1. Cover Page
    2. Table of Contents
    3. Executive Summary
    4. Project Charter (Scope Definition)
    5. Project Value Statement
  5. (50 points)PowerPoint Presentation to Management—The presentation to management should be prepared using Microsoft PowerPoint. In the presentation, you should discuss the project you are undertaking, the scope, and key points on the value of the project to the business. The presentation should be created as though you were convincing senior management of the value of this project. This presentation will both be posted this week in the Dropbox and recorded in iConnect.

Preview:

Top Dog Hotdog is an MIS project that focuses on developing a cloud-based information system that is aimed at aiding the Top Dog Hotdog business to effectively manage different business operations. The system will contain a number of modules…

MIS 600 Information Systems

Milestone Two Week 3

https://www.hiqualitytutorials.com/product/mis-600-milestone-two/

Welcome to Week 3! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 4.
  4. (50 points)Milestone Two—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One items and the following Milestone Two items:
    1. Project Strategy Statement
    2. Project Methodology
    3. Business Requirements and Rules
      1) Context-level data flow diagram (Visio)
      2) Use case list (normal business activities/work flows)
      3) Use case scenarios (description or narrative steps in each use case)
  5. (10 points) Peer Reviews—There is a Peer Review Template in Doc Sharing. Complete an individual review of each member of your team (including yourself) with comments (combine the evaluations in one Word file and place them in your individual Dropbox). These forms are confidential and should only be shared with your professor. Use them to let your professor know how to improve the course and/or the capstone experience.
  6. (25 points) Initial baseline Microsoft Project Plan in Microsoft Project. If you do not already have Microsoft Project software, it is available for free in the Student Software Store. In this initial effort, create a Gantt chart that shows all of your project activities from project initiation to project closing, in chronological order.  Include duration, start date, finish date, and predecessors for each item.

Preview:

The second stage will involve the definition of the requirement or documentation of the project specification. This will be drawn based on the survey results. Each identified problem will be evaluated and a possible solution will be defined where particular aspects that need to be fulfilled to enhance the…

MIS 600 Information Systems

Milestone Three Week 4

https://www.hiqualitytutorials.com/product/mis-600-milestone-three/

Welcome to Week 4! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 5.
  4. (50 points)Milestone Three—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One and Two items and the following Milestone Three items:
    1. Logical Entity Relationship Diagram (Visio)
    2. Physical Entity Relationship Diagram (Visio)
    3. UML Use Case Diagram (Visio)
    4. UML Sequence Diagram for four Use Cases (Visio)
    5. UML Class Diagram (Visio)

Preview:

The payroll management solution will provide the business with a computerized/software based payroll management system that will allow a high degree of accuracy in keeping track of an employee’s personal information as well as benefits and time off.

The inventory management solution will provide a database with internet access for storing inventory and give the business the ability to calculate weekly orders based on historic sales data, allowing the business conserve capital…

MIS 600 Information Systems

Milestone Four Week 5

https://www.hiqualitytutorials.com/product/mis-600-milestone-four/

Welcome to Week 5! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 6.
  4. (50 points)Milestone Four—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One, Two, and Three items and the following Milestone Four items:
    1. System Alternatives Descriptions
    2. Feasibility Analysis
    3. Technical Requirements and Assumptions
    4. Analysis of Needs vs. Capabilities for Contractors
  5. (10 points) Peer Reviews—There is a Peer Review Template in Doc Sharing. Complete an individual review of each member of your team (including yourself) with comments. Combine the evaluations in one Word file and place them in your individual Dropbox. These forms are confidential and should only be shared with your professor. Use them to let your professor know how to improve the course and/or the Capstone experience.

Preview:

To improve Top Dog’s manual process by using technology to optimize and access information in a timely manner for effective business decision-making and increase sales by 10%.  To provide hungry sport fans in….

MIS 600 Information Systems

Milestone Five Week 6

https://www.hiqualitytutorials.com/product/mis-600-milestone-five/

Welcome to Week 6! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 7.
  4. (50 points)Milestone Five—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One, Two, Three, Four and the following Milestone Five items:
    1. Project Risk Analysis and Risk Management Plan
    2. Project Costs, Staffing, Resources, Dependencies, and Schedule

Preview:

Managing information, tracking inventory, and making smart business decisions based on readily available information are elements which enable a company to continue to profit in any marketplace. A cloud-based ERP is a system that will manage…

MIS 600 Information Systems

Milestone Six Week 7

https://www.hiqualitytutorials.com/product/mis-600-milestone-six/

Welcome to Week 7! Here are the activities this week:

  1. (10 points)Hold at least one iConnect meeting with your team and record it (this is part of your participation grade).
  2. (10 points)Ensure that you meet individual posting requirements in the graded discussion area (this is also part of your participation grade).
  3. (10 points)Fill out a Team Status Report by end of week and turn it in to the Dropbox. There is a status report template in the Dropbox. Be sure to show which team member is responsible for each of the course deliverables in the course and the due dates for each deliverable. Also, indicate when you plan to have your team meeting in Week 8.
  4. (50 points)Milestone Six—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One, Two, Three, Four, Five, and the following Milestone Six items:
    1. Integration of Internal and External Systems
    2. System Administration, Security, Backup and Recovery
    3. Scope Administration and Change Control Procedure
  5. (200 Points)Final Project Plan—After you complete Milestone Six, go through the entire Milestone Project Plan as a team to ensure that you have made any changes suggested by your professor during previous weeks and that all of the Milestones fit together in one cohesive, professional document. Your sponsor should be able to pick up the document, read it from cover to cover, and understand the project well enough to make a funding decision.
  6. (50 Points)The Final .mpp file, prepared in Microsoft Project, is also a deliverable for Week 7. Update your initial plan with any new steps you have discovered since it was created and add the resources you have described in Weeks 4 – 6.

Preview:

The project will be based on normal information system development techniques. In this case, a systematic system development technique that resembles the waterfall system development technique will be employed. This will involve an initial investigation to enhance the…

MIS 600 Information Systems

Final Presentation Week 8

https://www.hiqualitytutorials.com/product/mis-600-final-presentation/

  1. (50 points)Final PowerPoint Presentation to management—The presentation to management should be prepared using Microsoft PowerPoint. In the presentation, you should discuss the project you are undertaking, the scope, and key points on the value of the project to the business. The presentation should be created as though you were convincing senior management of the value of this project. This presentation will both be posted this week in the Dropbox and recorded in iConnect.
  2. (10 points) Peer Reviews—There is a Peer Review Template in Doc Sharing. Complete an individual review of each member of your team (including yourself) with comments. Combine the evaluations in one Word file and place them in your individual Dropbox. These forms are confidential and should only be shared with your professor. This is your final chance to make Capstone better for future students. Don’t hesitate to tell us what you think.

Power Point Presentation

MIS 600 All Discussions

https://www.hiqualitytutorials.com/product/mis-600-all-discussions/

Week 1-7 All Students Posts 128 Pages 

Capstone Project Idea Discussions Week 1 All Students Posts – 26 Pages 

https://www.hiqualitytutorials.com/product/mis600-capstone-project-idea/

Any project ideas and interests? The idea is not to discuss a specific team project, but to discuss the kinds of business problems that can be solved with technology.  If you have an interest, voice it. I am forming teams and I will look for common interests.

As we discuss ideas this week you will find that there are a few criteria. First, your project must be of a scope that is doable in seven weeks. Second, all projects that solve business problems must have software, hardware, and database components.

Discuss potential capstone project ideas and your thoughts on why it would be a good project. What are some concerns you would have for this type of project?…

Class what is the impact on business if an upgrade to IPv6 is not made?  Can you come up with a business impact?  For example, will a business earn more money or gain more customers if they do this? Class from a business perspective Joseph lists some real risks.  The impact of these risks could be loss of productivity, litigation, or even loss of personnel.  Can you think of a system with hardware, software, and database components that might address these risks?  For example, could a training system help?

Milestone 1 Discussions Week 2 All Students Posts – 19 Pages 

https://www.hiqualitytutorials.com/product/mis-600-milestone-1/

What makes a good Executive Summary? How is it different from the Project Charter or the Value Statement?

In 1-1 ½ pages describe the situation in the industry and the problems the company is facing. Also state the advantages of solving the problem/problems. This is the only section that managers often read so it needs to be clear, direct and interesting to read. For example, you might state that many companies are facing security threats because of out of date solutions and processes. You then state who you are and why your consulting company is an expert in this area and how you can solve the problems.

2. Project Charter

The project charter should describe the project in broad terms and include:

a. Project Objectives

b. Project Conception

c. Problem Statement

d. Initial Scope of the project

e. Project Vision

f. Business Constraints

g. Technology Constraints

h. Project Strategy

i. Project Documentation and Communication

j. Project Organization and Staffing Approach

Later you will be comparing solutions. Right now you are talking about what will be covered and what is in and out of scope.

3. Project Value Statement

What is the value to the client or customer? Give an overview of all the value this project will bring to the business. Why should they allocate money for the project? How will this increase business, or decrease costs, or increase customer satisfaction, etc.?

Can anyone offer advice or examples of how to create these items in your business setting?  Can you think of other situations where you may need to make the value of a project conditional?

Milestone 2 Discussions Week 3 All Students Posts – 18 Pages 

https://www.hiqualitytutorials.com/product/mis-600-milestone-2/

What is the best way to document business requirements and rules?  In addition to Milestone 2, we also need to complete an initial Microsoft Project file, peer reviews, and your status report. To get started, what does Microsoft Project software bring to your projects? Why do we use it?…

Class is there any difference between a corporate strategy statement and a project strategy statement? Class throughout your degree program you have discussed development methodology. How do you decide which methodology is best for your project? Have you ever found a reference that compares methodologies and tells you when to use them?

Milestone 3 Discussions Week 4 All Students Posts – 19 Pages 

https://www.hiqualitytutorials.com/product/mis-600-milestone-3/

Can you explain the difference between data and entity models, data flow diagrams and process models?  Class to get us started, what is a sequence diagram and why might we use one?  If you are not familiar with UML diagrams you may wish to review them in the textbook…

Class some of the teams are having difficulty this week because they did not have solid use cases or use case scenarios last week.  Can anyone explain in their own words why we create use cases?  How do you form a use case? What does a use case represent?  Likewise can anyone explain in their own words why we do a use case scenario?  What do we put in a scenario?

Class be sure to read through the information on Class Diagrams and all UML diagrams in the textbook.  It can be very helpful.  For the developers in our group.  What is a class in programming?  Why is this concept important and how can the class diagram help?

Class do you create both logical and physical diagrams in your organization?  How might each be used and how should they be different?

Milestone 4 Discussions Week 5 All Students Posts – 15 Pages 

https://www.hiqualitytutorials.com/product/mis-600-milestone-4/

The system alternative assessment section sets the tone for the rest of the project. Why do we look at alternatives before we look at technical requirements?  What are the alternatives?”. Why is it important to look at alternatives before defining technical solutions? Can you offer an example?…

Class when might we employ contractors? Project managers teach that contractors can reduce time, cost, scope or risk.  Are there other reasons to employ contractors?

Class there always seem to be lots of technical solutions for any given technical requirement.  Which hardware box?  Should you buy servers, create virtual versions, or rent servers in the cloud?  Which DBMS? Which network solution?  How do you pick a particular solution?  What assumptions, if any, must you make?

Given the current economic situation, what might be an appropriate discount rate?  What are your reasons for selecting your discount rate?

Milestone 5 Discussions Week 6 All Students Posts – 16 Pages

https://www.hiqualitytutorials.com/product/mis-600-milestone-5/

When we do a risk analysis, why is it important to be as specific as possible? What should or should not be included in this analysis?  What are the steps suggested by the Project Management Institute (PMI)? How might you apply them to your project?…

Class how do you apply the steps to your projects?  For example, how do you identify risks for your project?  Can you offer examples of risk avoidance, acceptance, transference or mitigation?  What is mitigation?  Has anyone used risk transference?

Class in many organizations where I have consulted they created a contingency fund for risk in their projects.  Basically they calculated the amount by multiplying the impact of all of their risks by the respective probabilities.  They then summed the results to come up with a dollar figure.  The fund was adjusted, as needed, throughout the project.  How do your organizations budget for risks in your project planning?  What are some ways to enter costs and resources in Microsoft Project?

Final Project Document Discussions Week 7 All Students Posts – 15 Pages 

https://www.hiqualitytutorials.com/product/mis-600-final-project/

The Final Project Document brings all six milestones together into one, integrated document. What are some ways to make the document more professional?  What are some techniques that help to make a plan more professional? How can you make your plan “stand alone” so anyone who picks it up understands its merits and how to implement it?…

Class how do you manage scope? Just how does configuration management work as a process? Has anyone worked with a configuration control board or a change control board?

The audience is your development team and perhaps your customers.  What types of things are you putting in this section for your project?

MIS 600 Information Systems

Keller