MIS 600 Milestone Two

$15.00

MIS 600 Milestone Two
Milestone Two—The project document you will prepare throughout the class should…

SKU: MIS 600 Milestone Two Categories: , Tags: , , ,

Description

MIS 600 Milestone Two

MIS 600 Milestone Two

A+

Welcome to Week 3! Here are the activities this week:

(50 points) Milestone Two—The project document you will prepare throughout the class should be prepared using APA guidelines. The paper should be double-spaced, using Arial or equivalent, 12-point font. One team member should submit the completed Milestone Project Paper to the Dropbox for the team each week. This week the Milestone Project Paper should contain all of the Milestone One items and the following Milestone Two items:

  1. Project Strategy Statement
  2. Project Methodology
  3. Business Requirements and Rules
    1) Context-level data flow diagram (Visio)
    2) Use case list (normal business activities/work flows)
    3) Use case scenarios (description or narrative steps in each use case)

Preview:

The second stage will involve the definition of the requirement or documentation of the project specification. This will be drawn based on the survey results. Each identified problem will be evaluated and a possible solution will be defined where particular aspects that need to be fulfilled to enhance the…